BOOKED. on 14 November. London, £249, 5 hours CPD, "only 30 seats"BOOKED. on 14 November. London, £249, 5 hours CPD, "only 30 seats"BOOKED. on 14 November. London, £249, 5 hours CPD, "only 30 seats"BOOKED. on 14 November. London, £249, 5 hours CPD, "only 30 seats"BOOKED. on 14 November. London, £249, 5 hours CPD, "only 30 seats"BOOKED. on 14 November. London, £249, 5 hours CPD, "only 30 seats"BOOKED. on 14 November. London, £249, 5 hours CPD, "only 30 seats"BOOKED. on 14 November. London, £249, 5 hours CPD, "only 30 seats"
Book your seat on Eventbrite →
Dream SQUAT

Squat Dental Practice Project Management & Turnkey Fit-Out

Full project management and turnkey build for new dental practices. CQC-compliant HVAC, HTM 01-05 decontamination rooms, surgery set-up and dental chair plumbing, managed end to end.

Book a free build consultation →

Turnkey Project Management for Your Squat Dental Practice

We provide full project management and a turnkey solution for your dental practice build, from the first site visit to handing you the keys of a CQC-compliant practice. One team coordinates the design, trades, equipment and sign-offs, so you're not left juggling contractors while still working as an associate.

Book a free compliance consultation →

Already have a builder? Don't worry

Whether your builder is a dental specialist or a general contractor, we'll project manage the whole build. We turn dental and CQC requirements into clear specifications your builder can follow, check the work at every stage, and make sure nothing is missed before handover.

Fully CQC compliant: we know the regulations

A dental practice isn't an ordinary fit-out. Get the ventilation, plumbing or decontamination layout wrong and you risk delays to your CQC registration, or expensive rework. We design and build to the rules from day one.

Air conditioning and HVAC.

Ventilation and HVAC units specified and installed to meet CQC and infection-control expectations, including the right air changes in surgeries and the decontamination room.

Decontamination room set-up (HTM 01-05).

Clean-to-dirty zoning, instrument workflow, airflow and cabinetry laid out to HTM 01-05 guidance, ready for validation and audit.

Surgery set-up to CQC standards.

Surgery layouts planned around chair orientation, natural light, clinical hand-wash sinks, storage and chaperone space.

Plumbing for dental chairs.

Water, drainage, power, compressed air and suction routed to every chair position, with compressor and suction plant housed correctly and quietly.

X-ray and radiation safety.

Room shielding and X-ray and OPG positioning coordinated with your Radiation Protection Adviser.

Planning, building control and fire safety.

Change of use, building regulations, fire safety and disabled access managed alongside the build, so nothing holds up registration.

How we deliver your build

Site assessment:

We survey your unit and confirm it can become a compliant dental practice.

Design and budget:

Dental layout, services drawings and a realistic cost plan.

Approvals:

Planning, building control and landlord consents.

Build and fit-out:

Trades coordinated, regular site visits and weekly progress updates.

Equipment installation:

Chairs, decontamination, X-ray, compressor and suction installed and commissioned.

CQC-ready handover:

Snagging completed, certificates collected and evidence ready for your registration.

Why a project manager saves you money

Most delays and overspends on squat builds come from poor coordination between the designer, builder, equipment supplier and compliance requirements. A dedicated project manager keeps every party working to one plan, one budget and one opening date.

Saba Arif, project manager
Meet our project manager

Subhan Arif

Subhan has more than five years' experience building squat dental practices from empty shell to opening day. An aeronautical engineer by training and a qualified risk assessor, he brings engineering precision to every project, from HVAC and decontamination workflows to site safety and final snagging.

  • 5+ years building squat dental practices
  • Aeronautical engineer
  • Qualified risk assessor
Talk to Subhan about your build

FAQ’s

Yes. We project manage dental and non-dental builders alike, giving them the specifications they need for HVAC, decontamination, plumbing and surgery set-up.

It's the national guidance on decontamination in primary care dental practices. It shapes how your decon room is laid out, ventilated and run, and we design to it from the start.

We can assess a unit before you commit, so you know whether it can work as a compliant dental practice.